Fracking wastewater

Water use

Hydraulic fracturing (or fracking) makes use of large quantities of water into which chemicals and proppant (mainly sand) is mixed. The process starts by drilling a vertical well which, when it reaches the shale deposits it is turned horizontally. A "necklace" of shaped explosive charges is inserted, which when detonated produce a series of holes in the pipe. The fracking water is pumped at a high pressure (depending on the depth), which forced from the holes, produces "fractures" in the shale, which are then "propped" open by the proppant, mainly sand, to prevent the fractures from closing and to let the oil or gas in the shale to be released once the hydraulic pressure is released.

Once the hydraulic pressure is released, some, but not all, of the injected water flows back to the surface as "flowback", which contains some of the recovered oil or gas from the shale and which is then separated from it, though not totally. The initial flowback of around 800 to 1000 cubic metres a day tails off and is followed by the "produced" water which then replaces it with "formation" water. Part of the returning water can be treated on the well pad with a trailer-mounted treatment plant and be re-used.

The amount of production water used for fracking varies from 8,000 to 23,000 cubic metres per well (2 million to 6 million US gallons). If 40% of the production water is returned, some 9,000 cubic metres of wastewater could arise over the life of the well.

Wastewater composition

A mixture of the returned flowback and produced water contains some of the added chemicals and proppant, but also dissolved toxic metal salts, some radioactive, from the shales into which the initial water was injected. There is also a certain amount of dissolved methane and other petroleum compounds in it, including volatile organic compounds (VOCs). The biggest problem is the raised salinity expressed in total dissolved solids (TDS), which can be many times more than that of seawater. 

Wastewater handling by the wells

In the US wastewater is stored adjacent to the drilling pad in lined open pits (impoundments, or lagoons) prior to disposal. This is highly problematic as the dissolved gas and petroleum compounds evaporate and cause severe health problems. Liners can leak and rain downpours would lead to overflow and local ground contamination. Some sites have more than one impoundment, which can be the size of a football pitch. Some impoundments have caught fire with lightning strikes, because of the petroleum content.

Open pits are prohibited in the UK and double-skinned tanks are deployed for the on-site storage of the wastewater. There will have to be multiple tanks to cover the initial chemicals and sand addition, to contain the flowback and produced water, to hold treated wastewater for re-use and to hold concentrate from the re-use treatment plant for disposal. 

Methane and volatile organic compounds (VOCs) come up in a mixture with the flowback and produced water. On the drill pad is a separation plant to route the gas initially to the flarestack and then to the export pipeline. The process is not 100% efficient and there will be residual methane and VOCs in the wastewater.

As the returned water will displace the atmosphere in the enclosed tanks the tops will be connected to a flare stack to burn off the dissolved methane and other petroleum compounds. The tanks holding the flowback and produced water should be equipped with heaters to boil off the residual dissolved methane and VOCs to facilitate their destruction in the flarestack. The smoke, smells, flickering and noise from the flare can also be a health hazard, but less than if released unburned.

In the US the evaporation of the volatile organic compounds from the open pits has led to the huge health problems of neighbouring people and animals, covered up by leasing and royalty "gagging" agreements. VOCs can be benzene, ethylbenzene, toluene, xylenes, n-hexane, carbonyl sulphide, ethylene glycol and/or 2.2.4-trimethylpentane.

There are two main means of wastewater disposal, deep well injection of it untreated and by transfer to a treatment works.

Deep well injection

In the US the wastewater is trucked to regulated deep injection wells, which are tested and classified by the EPA for specific uses. Fracking fluids are handled in Class II wells. Although there are thousands in use they are insufficient to handle the vast amounts of wastewater arising from fracking operations. There was a major explosion at an injection well at Denver in April 2015 when lightning ignited the dissolved gas and petroleum in a delivery of wastewater.

The practice is prohibited in the UK and even if it wasn't there is not an established regulatory infrastructure  as in the US. If subsequently allowed, there would have to be seismic exploration and drilling to find suitable deep porous rocks able to store the fluids securely. There has been some re-injection in redundant conventional wells, but the number of these would be insufficient for the intensive fracking intended. Re-injection into shales is not practical as they are not porous enough, but in any case cannot proceed until production from the well ceases.

Oklahoma has recently become the most earthquake-prone state in the US which scientists say are due to the re-injection of wastewater as part of the fracking process. In Ohio in March 2014 there were dozens of earthquakes, including one of a magnitude of 3.0. Oklahoma suffered 138 earthquakes of magnitude 1.5 or greater in October 2016 alone, adding up to 2,199 over the year - including its largest quake ever, one of 5.8 magnitude in September 2016. 

Treatment plants

The initial test drilling by Cuadrilla in Lancashire resulted in 8,000 cubic metres being trucked to United Utilities Davyhulme works on the side of the Manchester Ship Canal in 300 road tanker movements. What happened to it there is not revealed, but the works has since declined to request a permit for further inputs.

In the treatment works, the suspended solids, together with some precipitated dissolved solids as sludge are settled in sand or filtered and the sand and filter cake together with the filter aids are sent to landfill. If the sludge is radioactive it has to be sent to a specialist low level radioactive waste repository or if classed as high volume very low level waste to landfill. 

Some of the toxic metals are as salts in solution as part of the total dissolved solids, some insoluble as part of the suspended solids content of the wastewater. 

Chemical precipitation is widely used for the removal of metals and other inorganics, suspended solids, fats, oils, greases, and some other organic substances from wastewater. Precipitation is a method of causing contaminants that are either dissolved or suspended in solution to settle out of solution as a solid precipitate, which can then be filtered, centrifuged, or otherwise separated from the liquid portion. 

Chemical precipitation is used for removal of heavy metals such as Fe, Al, Ca, Mg, Mn, Zn, Si, Sr, B, Pb, Cr and As from wastewater.  The chemicals used are lime, ferrous sulphate, ferric chloride and alum for precipitation and polymers as filter aids. The pH for removal of most of heavy metals by chemical precipitation is 8 except for Ca, Sr and B when it is pH 10 or higher. The removal efficiencies vary for each metal salt as do the chemicals needed. As the pH must be adjusted for optimum precipitation of a particular metal, it cannot be appropriate for all of those in solution. 

The environment quality standards (EQSs) for the discharge of priority substances (such as mercury and cadmium present in the Cuadrilla Preese Hall wastewater) are as low as 0.07 µg/l and 0.9 µg/l to 1.5 µg/l respectively. See Appendix 2. Chemical precipitation and the following separation of the produced suspended solids is unlikely to be sufficient to meet the standards. Moreover, for the range of heavy metals likely to be present, the cocktail of chemical additives and pH adjustments will vary between wells at different locations, so that the management of fracking wastewater treatment presents considerable challenges and costs. The high salinity may prevent the use of lime as it will precipitate some of the hardness yielding an increased load on the filtration equipment. 

Subsequent to the availability of the wastewater analytical results the treatment plant will have to submit a 'bespoke' treatment plan and a quotation for the costs of it. Moreover, as the toxic salts and NORM in the flowback and produced water when treated will scale up the pipework and equipment, the treatment plant may have to install a dedicated plant line for fracking wastewater with cleaning-in-place (CIP) to maintain its flow. The methane and VOCs dissolved in the wastewater may also be problematic and should be removed before transport to avoid explosive and health problems at the treatment plant.

Also the high salinity of the treated water means it cannot be disposed of into an upper estuary, whereby the upper waters are less saline than the sea or even into the sea, unless it can be diluted with perhaps five times its volume with other less saline effluent streams.

Municipal sewage works are unable to take in fracking wastewater. EA has nominated four treatment plants with permits, viz., Castle Environmental at Stoke-on-Trent, FCC Environment at Leeds and Sheffield and Bran Sands at Middlesbrough. The Stoke-on-Trent, Leeds and Sheffield plants discharge into the Trent, Aire and Don rivers respectively and are therefore unlikely to be able to dispose of the high fracking wastewater salinity. Limited quantities could be treated by dilution with other treated effluents, but although the concentration of the toxic metal salts and  organic compounds would be reduced, the actual quantities of the dangerous substances released into the rivers would not change and could build up in the bottom sediments.

Permits

The flowback and produced water must be analysed before the issuing of an EA permit for disposal. The selected ultimate disposal method, deep injection well (if there ever is one) or treatment works needs a permit for acceptance of it. It also needs permits for the disposal of the treated water, for the transport of the sludge and filter aids to landfill, the transport of the radioactive sludge and for the acceptance by the low level radioactive repository. As until fracking flowback and produced water arise at the pad surface it cannot be analysed, but the analysis of the Preese Hall wastewater is available and gives an indication of the likely analysis of the wastewater from the four new test drillings nearby in Lancashire.

EA states "All flowback waters produced from hydraulic fracturing activities (at both the exploration and production phase) must be treated and disposed of at a permitted facility. There are no exceptions to this rule. Treatment and disposal must be conducted in line with all of the conditions of the environmental permits, including conditions for priority substances (dangerous substances)."

Bran Sands waste treatment plant

The Northumbrian Water Bran Sands treatment works at Middlesbrough is equipped with sewage sludge handling with anaerobic digestion and has an industrial treatment section capable of 200,000 cubic metres per day which may be augmented with additional facilities for treating fracking wastewater. It currently discharges into a creek joining the Tees near its mouth and could alternatively, with a pipeline, discharge the high salinity effluents far out to sea, but the toxic salts and radioactivity would have to be removed beforehand. Fish in the area of discharge would be examined for toxic metal and organic substances in their flesh.

Bran Sands has a comprehensive "Consent to Discharge" for its sewage and industrial effluent, but its lists of dangerous substances need augmenting with EA's table of their concentration limits. See Appendix 2. The allowable levels of concentration of the toxic metals in solution are for some as onerous as below a microgram per litre of discharge fluids. 

Bran Sands has a permit for disposal of radioactivity from its treatment of wastewater from off-shore oil and gas rigs landed by ships at its works. The Bran Sands plant is currently the most likely treatment works in the UK able to take in fracking wastewater in sufficient quantities, but is 130 miles from the test drillings in Lancashire. The 9,000 cubic metres of wastewater per well would require 350 or so road tanker journeys to it. 

Cuadrilla enquired as to Bran Sand's ability to take in its wastewater, but an operator cannot submit a requested sample of it until the first flowback occurs and it can be analysed. The added chemicals will arise in the flowback, while the toxic metal salts and high salinities arise in the ensuing produced water, so that a full analysis will not be immediately possible. However, Cuadrilla published its analysis of the wastewater from its aborted Preese Hall test drilling, which enables an assessment of the treatment process to be made. 

See Appendix 1

Shale gas operators have to demonstrate to EA that they have a written agreement from a company with a radioactive substances activity permit that can treat and dispose of their waste for the EA permit application process to be validated. No such agreement can be signed between Cuadrilla and Northumbrian Water, the owner of Bran Sands, until sufficient flowback has arisen, analysed and stored on the drilling pad while and until the necessary permits are issued. 

Processing of high Total Dissolved Solids (TDS) wastewater

The limit for treatment of high TDS by reverse osmosis (RO) is 40,000 mg/l. The osmotic pressure to be reversed rises with the TDS, making the construction of the membrane modules for higher TDSs impractical. Cuadrilla's Preese Hall wastewater had a  mean TDS of 170,000 mg/l with an osmotic pressure of around 160 bar, so if the new drillings are similar RO will not be an appropriate method of reduction of its TDS before disposal. The only possible practical method is evaporation and crystallisation. A mechanical vapour compression (MVC) process is available trailer-mounted and could be used on site for wastewater treatment with partial re-use. The compressor, driven by a diesel engine, provides the evaporation heat. 

Quantity of wastewater to be treated

The question is how much wastewater will be treated if fracking is established to provide a substantial amount of the UK's natural gas consumption? Until a field operationally matures, the recovery factor and ultimate well recovery (EUR) will not be known. 

Natural gas consumption in the UK in 2015 was 2,400 bcf, with production around 1,400 bcf, with a deficit of 1,000 bcf. With an ultimate estimated recovery of 4 bcf/well it requires, once steady state production is achieved, 250 wells to be drilled a year to fill the deficit. The final amount of flowback and produced water together can be 22,000 x 40% = 9,000 cubic metres per well. The quantity of fracking wastewater for treatment is then 9,000 x 250 = 2.25 million cubic metres a year, or 6,000 cubic metres per day. 

In the case of the test drillings, the initial water input is 800 to 900 cubic metres per day, with 25% of the 9,000 cubic metres returning in the first few days amounting to 2,250 cubic metres. 

In the US trailer-mounted evaporator/crystalliser could process 200 cubic metres/day has been deployed. It has an associated cleaning-in-place unit to keep it operable, which will then pass the removed, possibly radioactive sludge, to transport to a waste handling facility. There would be a requirement of a 2,000 cubic metres tank to hold the flowback for treatment over 10 days, with a similar size tank to take the distilled water for reuse.

However, in the UK the intention is to store untreated wastewater on the drilling pad and transport it off site to external facilities. However, a mobile, universal treatment plant could be deployed to cater for the wastewater arising from the exploratory well drilling to establish whether in a particular area fracking is viable. If trailer-mounted, as is available, it can then move to the next test drilling. It is uncertain whether such plants work as a large, $300 million treatment plant installed in West Virginia has failed in service.

Operator requirement

The question of handling the flowback and produced water from fracking operations in the UK remains an unsettled question, unresolved by the Shale Gas Task Force, nor by the Cuadrilla Planning Inspector’s appeal report.* The responsibility for nominating a waste disposal facility with the ability and capacity to take the flowback fluid is primarily the responsibility of the operator. If the operator is unable to identify “… somewhere to take the waste it would have to take the necessary measures to ensure that no further waste of this type is generated …” (sic)*

The problem is that for every well the analysis of the flowback and produced water is unique for it and cannot be determined until the fracturing is complete. A large proportion of the injected production water, with its chemical additives, returns to the surface together with the minerals and metal salts (and possibly some  radioactivity) it brings up from the shale with the gas, NGLs and oil.

If fracking is established then hundreds, if not thousands of wells, will be drilled and it will be impossible to specify a “bespoke” treatment solution for each one after it has been drilled and fracked. Operators would find their operations frozen just when gas production is needed to justify their investment.

What is needed is a universal treatment facility able to cater for all the possible variations in wastewater content.

Zero Liquid Discharge plants

The only type of treatment plant that can be deemed as universal is the Zero Liquid Discharge type (ZLD) in which after pre-treatment an evaporator/crystalliser process produces distilled water for re-use and a sludge for disposal in landfill. The treatment plant will have its own wastewater problem from the regular cleaning-in-place (CIP) to avoid scale build-up in the equipment and piping.

Once it is clear that an industry can be established, then the necessary capital can be raised for a centralised treatment facility.

ZLD providers

Antero Resources announced it is stepping up its recycling efforts in the Marcellus/Utica play by hiring Veolia Water Technologies Inc. to build a new shale wastewater recycling facility in Doddridge County, West Virginia. It is named Clearwater. The facility, which was commissioned in 2018 cost Antero $275 million, was to process 60,000 barrels (9,500 m^3) of wastewater per day. A central ZLD treatment plant this size would cater for 300 well drillings per year. The site has its own landfill, into which the salt is deposited. However, the radioactivity is concentrated by the process in the sludge and has to be separated and transported off-site to a specialist landfill.

In its 2018 Annual Report page 15 Antero included the following statement:-

Antero Midstream also owns a wastewater treatment facility with a designed capacity of 60,000 barrel per day for the treatment of our flowback and produced water for subsequent use or sale for well completions. To date, the facility has run at reduced operating rates below the designed capacity and therefore not met certain completion milestones under the terms of the agreement between Antero Midstream and the construction contractor. Antero Midstream has made improvements to the facility's design and anticipates an increase in wastewater treatment volumes during 2019 as compared to 2018 and has included the final milestone completion payments under the construction contract in its 2019 capital budget.

Unfortunately, the Clearwater plant failed and in terms of its supply contract Veolia is obliged to remove it and compensate Antero. The reason is not disclosed, but it may have filled with a toxic metallic and radioactive sludge. Its competitors' equivalents have been subject to chloride corrosion of their stainless steel components.

The Antero Veolia "Clearwater" ZLD in West Virginia is associated with its own landfill pit alongside it, so it was assumed that all the sludge containing the salt, metal salts and radionuclides could be readily disposed of without the need for transport to landfill sites. However, it now appears that the NORM is concentrated in the process and is to be separated and transported off-site to a specialist landfill. With the closure of its Clearwater ZLD the re-use of Antero's wastewater has stalled.

Other ZLD providers

GE offers complete thermal and non-thermal ZLD solutions to manage tough-to-treat wastewaters. GE’s proprietary evaporators, brine concentrators, and crystallisers can help recover more than 95% of your plant’s wastewater while reducing the remaining brine as a product or solid.

Aquatech has an unparalleled depth of experience in ZLD, which include more than 160 installations, including stand-alone thermal/evaporative processes, membrane processes, or hybrid systems. Zero-liquid discharge (ZLD) is a water treatment process in which all wastewater is purified and recycled; therefore, leaving zero discharge at the end of the treatment cycle. ZLD is an advanced wastewater treatment method that includes ultrafiltration, reverse osmosis, evaporation/crystallisation, and fractional electro-deionisation.

GEA Zero Liquid Discharge for Environmental Protection. A global environmental awareness and focus on conserving water and water pollution has led to increasingly stringent regulations on the use and discharge of industrial water. GEA’s zero liquid discharge (ZLD) technology is ideally placed to enable many sectors of industry to clean and recycle their process water.

Eureka Resources at Standing Stone has a gas well wastewater treatment facility, located outside the town of Williamsport in Pennsylvania. Low salinity wastewater is treated with reverse osmosis (RO), while higher salinities are subject to evaporation and crystallisation. Sales of salt for industrial purposes and acceptably treated water for re-use offset the input costs.

Energy inputs

The whole process of fracking and the handling of the wastewater is energy intensive, particularly the use of the chain of coupled high pressure pumps for the hydraulic injection of the fluid into the shale. (Up to 100 MPa; 15,000 psi). Wastewater handling adds further energy intensity to the process with the energy requirements for evaporation plus crystallisation (or RO) and its road tanker transport.

There are additional energy costs for the provision and management of the double-skinned tanks over those of the open pits common in the US and considerable energy losses in the initial flaring of the product until it can be piped away.

If injection wells are eventually conceded then the transport to them and the high pressure pumping needed for the injection will incur energy inputs. 

It may well be that the overall energy inputs will exceed the energy in the natural gas recovered and only fracking for "wet" gas (with NGLs) and oil will be viable.

Naturally-Occurring Radioactive Materials (NORM)

Uranium occurs in almost all soils and sediments. It is radioactive and when it decays it produces many decay products which are more radioactive and radiotoxic than uranium itself. These decay products, including radium and radon are dissolved in the produced water from both conventional and unconventional oil and gas extraction.

The pipes, tanks and equipment that handle the produced water become scaled with various metal salts, including radium and its decay products. Radium is chemically similar to barium, strontium, calcium and magnesium and becomes incorporated in sulphate or carbonate deposits as scale. 

Wastewaters also contain heavy metals and are highly saline so that the sludge from a zero liquid discharge process will contain chlorides, toxic metal salts and radioactive isotopes. The salt from some of the ZLD processes described above, will not be saleable if so contaminated. There will also be metal salts and radionuclides in the effluents from the Cleaning-in-Place (CIP) used for de-scaling the ZLD and trailer-based evaporator/crystallisation processes.

UK waste management facilities

In the UK there are three nominated landfill sites for radionuclides including NORM, FCC in Cumbria, Sita in Lancashire and Augean in Northamptonshire, but their capacity is too limited to take in the quantities of the contaminated wet sludge arising from the anticipated shale gas production from 250 wells drilled per year. The wet sludge could amount to 25% of the wastewater or 600,000 tonnes a year. If a centralised ZLD wastewater treatment process is established in the Bowland-Hodder shale production area it will need to be provided with its own more substantial landfill pit. This will need the agreement of Euroatom as have the three current registered sites.

Many wastewater plants use anaerobic "activated" sludge processes, but if contaminated with sludge from produced water the digestate will be contaminated with heavy metals and in some cases radionuclides and will not be able to be used on the land as fertiliser.

US practice

The reason fracking got away in the US is because Dick Cheney brokered a "holiday" from EPA regulation by freeing it from the Safe Drinking Water Act. (The so-called "Halliburton Loophole"). The horrific consequences for water resources in the US are now evident, but the industry is resisting tighter regulation and states have banned local fracking bans.

Fracking for gas in the US has led to huge financial "impairments" for the pioneers, especially BHP Billiton, BP, BG, Shell and Statoil even with the lax imposition of regulation.   

Conclusion

To facilitate the treatment of fracking wastewater, if fracking for gas in the Bowland-Hodder shale play goes ahead, a universal process catering for the different compositions associated with particular locations is needed. This means the adoption of Zero Liquid Discharge processes based on evaporation and crystallisation. Due to the high chloride content of the wastewater the materials of construction of the vessels, pipework and heat exchanger tubing will nevertheless be expensive. The discharge EQS (See Appendix 2) is so stringent that only a ZLD process will allow its standards to be met.

Such can be located central to a number of fracking locations and require no access to a watercourse as the only liquid leaving the plant is distilled water which can be re-used. However, the radioactive components of the residual sludge have to be separated and transported to a specialist landfill. The recovered salt is unlikely to be usable with its heavy metals content and other pollutants with in some cases some remaining radioactivity. 

However, the energy requirement for the treatment process and the associated transport and disposal options may exceed the energy content of the gas produced, as may the costs of handling the wastewater exceed the sales revenue. 

Work is needed, perhaps by a multi-faculty university investigation, to evaluate the economics of the whole fracking process, including dealing with the wastewater. 

So tight regulation in the UK with its prohibition of open pits and deep well injection may mean that fracking for gas in the UK will be uneconomic, ruling out the Bowland-Hodder shale which principally contains just gas. 

It means more intensive surveying in order to locate occurrences of "wet" gas with natural gas liquids and ethane or oil, but even if successful it is doubtful whether such will be economic..

John Busby (Revised 02 April 2022)

Appendix 1

Cuadrilla Preese Hall Wastewater Analytical Results

Appendix 2

Environmental Quality Standards - Hazardous Substances